Placer Dome Canada Limited ("Placer") has significantly increased exploration activity on Claude Resources Inc. ("Claude") Madsen property in Red Lake, Ontario as a result of a number of high grade intersections. To date in 2003, thirty-six holes totalling about 20,000 metres have been drilled on multiple target areas (Russett North, Devilliers, Creek, Footwall Tuff and Mine East).
Results from the Russett North zone are particularly encouraging with quartz-tourmaline, quartz-carbonate and colliform carbonate veining being intersected routinely. Visible gold ("VG") was observed in a number of holes with several returning assays that confirm the high-grade nature of this carbonatized mafic-ultramafic terrain. The Phase II expansion drilling (100-metre centres) of the Russett North zone started to vector in on a segment of this terrain referred to as the Treasure Box. Building on encouraging results from the 2002 drill program (see March 24th, 2003 press release on Claudes website), another three holes within this corridor encountered significant intersections in terms of both grade and width (see table below).
| RUSSETT NORTH/TREASURE BOX |
| Drill Hole |
From (m)
|
To (m)
|
Interval
|
Grade (gpt)
|
|
VG |
Comments |
|
|
|
|
|
|
|
|
| PDM03-27 |
107.04
|
108.29
|
1.25
|
3.22
|
|
|
Quartz-tourmaline veining |
| PDM03-27 |
111.04
|
112.26
|
1.22
|
9.86
|
|
|
Quartz-tourmaline veining |
| PDM03-27 |
332.62
|
335.06
|
2.44
|
7.59
|
|
Yes |
Quartz-carbonate veining |
| PDM03-27 |
343.17
|
344.39
|
1.22
|
4.07
|
|
|
Quartz-carbonate veining |
| PDM03-29 |
74.45
|
75.52
|
1.07
|
4.31
|
|
|
Colliform carbonate veining |
| PDM03-29 |
80.70
|
84.94
|
4.24
|
17.81
|
|
Yes |
Quartz-tourmaline veining |
| PDM03-30 |
321.01
|
322.10
|
1.10
|
1.12
|
|
|
Quartz-epidote stringer |
| PDM03-30 |
344.48
|
346.03
|
1.55
|
21.10
|
|
Yes |
Quartz-pyrite |
| PDM03-32 |
164.63
|
165.85
|
1.22
|
1.13
|
|
Yes |
Vein |
| PDM03-32 |
510.76
|
511.52
|
0.76
|
3.63
|
|
Yes |
Vein, tourmaline |
| PDM03-33 |
328.51
|
329.15
|
0.64
|
1.09
|
|
|
Quartz veining |
Elsewhere on the property, Phase I drilling near the past-producing Starratt-Olsen mine, intersected known Devillier & Creek zones as well as a new sheared and altered sulfide replacement zone in the mines footwall which was named the Footwall Tuff zone. Results from this target area are listed in the ensuing table. The significance of this new zone will be assessed in subsequent drill phases.
| Zone Project |
Drill Hole |
From (m)
|
To (m)
|
Interval
|
Grade (gpt)
|
|
VG |
Comments |
|
|
|
|
|
|
|
|
|
| Devilliers |
PDM03-150 |
131.71
|
132.84
|
1.13
|
1.51
|
|
|
Sulfide replacement |
| Devilliers |
PDM03-150 |
137.86
|
146.52
|
8.66
|
1.24
|
|
|
Sulfide replacement |
| including |
PDM03-150 |
137.86
|
140.43
|
2.56
|
3.26
|
|
Yes |
Quartz veining |
| Footwall Tuff |
PDM03-150 |
455.61
|
456.52
|
0.91
|
3.27
|
|
|
Sulfide replacement |
| Footwall Tuff |
PDM03-150 |
458.66
|
460.00
|
1.34
|
1.27
|
|
|
Sheared Tuff/sulfide |
| Creek |
PDM03-151 |
112.84
|
113.14
|
0.30
|
1.55
|
|
|
Sulfide replacement |
| Footwall Tuff |
PDM03-151 |
326.62
|
327.23
|
0.61
|
2.87
|
|
|
Epidote veining |
| Footwall Tuff |
PDM03-151 |
339.94
|
345.09
|
5.15
|
1.63
|
|
Yes |
Sulfide replacement |
| including |
PDM03-151 |
343.90
|
344.81
|
0.91
|
5.13
|
|
Yes |
Sulfide replacement |
| Devilliers |
PDM03-154 |
166.55
|
167.77
|
1.22
|
8.55
|
|
Yes |
Quartz veining |
| Creek |
PDM03-156 |
122.71
|
123.57
|
0.86
|
1.78
|
|
|
Sulfide replacement |
Momentum for the Madsen project is building as evidenced by a number of key infrastructure improvements including the construction of a 5.5-kilometre, all season, access road to the Russett North area and by increasing project personnel to 14 geologists and support staff to handle the enormous volume of core generated by the project. In excess of twenty kilometres of core has been drilled in 2003, however, about one third of the drill holes have yet to be logged, assayed and reported in their entirety.
Placer has undertaken extensive geophysics and 3D modeling of the Madsen property and will initiate a major trenching program shortly on the Treasure Box area prior to beginning Phase III drilling (25-50 metre centers) later this fall.
Placer Dome has the right to earn a 55% interest in Claudes 10,500-acre Madsen property by spending CDN $8.2 million prior to the end of 2004 and delivering a bankable feasibility study over the following two years.
Assaying and associated quality control of the Madsen core was done by Chemex Laboratories under the supervision of Yuri Dobrotin, P. Geo., Placer Dome District Geologist.
2003 Madsen Drilling Locations (click map for larger version)

Treasure Box Drilling Locations (click map for larger version)

Starratt-Olsen Drilling Locations (click map for larger version)
